Sludge holding tank and associated inlet and discharge pipework

A large capacity GFS Sectional tank was installed to satisfy the demand for extra storage capacity on site.

A custom design concrete base had to be installed to bridge over several redundant sludge drying beds and the discharge channel from these beds.  New decanting, inlet and tanker drainage pipework was installed throughout