Trusted Partner to the Water Industry

Warbrek WTW

The aim of this project was to alleviate the ingress of surface water into the potable water service reservoir. The drainage system was in a state of disrepair and required the grass to be removed prior to excavating the drainage media from the preformed channel. Once the drainage media had been removed, the drainage tiles were were then removed to expose the lower drainage channel – this channel shed water from the surface of the reservoir roof into drains running down the slopes of the reservoir banking.

Customers